I decided to let someone else do the dig work. I realized after the cost of renting an excavator and the time it would take me, a beginner, to complete the work it would cost just as much. I got a great price from the company that has already been doing the work so far (survey, plans, septic tests, etc.).
I would recommend getting at least two or three quotes before you decide on a company. Make sure you get the job details in writing, there are a lot of variables when it comes to digging on a slope. They could run into rock and have difficulty removing tree stumps, so a flat rate quote helps prevent too many surprises.
I received quotes from a few thousand dollars up to fourteen thousand dollars, so be careful!
My first attempt at building a complete cabin from scratch...no existing plans...no crew...just me! The site is seasonal, with only three to four months of access a year. Starting with bare land and no utilities. Location: Cedar Mountain area, Utah, USA
Tuesday, July 20, 2010
Monday, July 19, 2010
Tree Clearing
The trees have been cleared, now I can begin the dig work. They will dig the driveway and pad and lower that 32% grade around the leach field area down to under 25% slope (per inspector). It took me, and a friend for two days, 5 weeks (on weekends) total to clear about 20 trees. Several of them were already dead so I don't feel so guilty killing trees, there was a beetle that came through many years ago and killed a lot of trees. So, that was less than 40 hours total for clearing around 20 trees, not to bad!
Wednesday, June 16, 2010
Severe Slope
Well... the survey was completed this last weekend. I used the worksheet from my last post to double check the slope readings, looks like the slope of the lot is around 32%. Yikes... according to Utah code, special consideration is needed for slopes over 25%. This could require a horizontal cut into the mountain of up to 50ft, so that the septic's drainfield is setback from the slope. This would be an overwhelming task for building a small cabin.
Looks like we have a lot of layout planning ahead to see if this project can move forward!
Looks like we have a lot of layout planning ahead to see if this project can move forward!
Monday, May 31, 2010
Slope measurement
Here is a handy tool I find online! Once the survey is done in a couple of weeks I will take some slope measurements. I think they will do that with the survey, but won't hurt to have them too!